Transition piece installation:

1 Once the MP is secured, the TP will be lifted and installed.

 

2 The TP will be seated and adjusted until its verticality is confirmed; grouting then solidifies the 5-m joint connecting the TP to the MP.

 

All external attachments, including the boat landing, ladders and the working platform, are connected to the TP before it is installed. It takes 15–20 hours to install one complete MP/TP foundation.