Gemini: a detailed look

 

The consortium of Northland Power, Siemens, Van Oord and HVC is

bringing intelligent energy to The Netherlands

3

2

6

7

4

9

8

5

11

12

13

14

15

10

1

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

6

After the TP is installed and before the turbine tower is erected, the electrical interconnection cable will be laid. A protection system will safeguard the cable over the scour rocks. The cable will enter the MP and be raised internally to the disconnecter panel at the bottom of the TP, above an airtight platform.